GOCE and other New Missions: Technical Challenges and Scientific Applications Convener: T. Gruber
Co-Conveners: F. Flechtner , R. Biancale , T. Mayer-Guerr
EGU2009-1424 S Bettadpur and CSR-L2 Team Progress towards next generation GRACE gravity field data products
08:45–09:00
EGU2009-8714 A. Jaeggi, G. Beutler, L. Prange, U. Meyer, L. Mervart, R. Dach, R. Rummel, and T. Gruber Gravity Field Determination at AIUB: Current Activities
09:00–09:15
EGU2009-7148 C. Siemes, X. Liu, P. Ditmar, E. Revtova, C. Slobbe, R. Klees, and Q. Zhao Assessing mass change trends in GRACE models
GOCE Status
09:15–09:30
EGU2009-6282 R Floberghagen, D Muzi, M Fehringer, D Lamarre, B Frommknecht, G Vingione, A Tesseri, M Kern, G Plank, R Haagmans and the GOCE Operations Team GOCE: First In-Orbit Experience
09:30–09:45
EGU2009-3051 B. FOULON, B. CHRISTOPHE, and J.-P. MARQUE Accelerometers for the GOCE Mission: on-ground verification and in-orbit early results
09:45–10:00
EGU2009-5375 B. Frommknecht, C. Stummer, G. Vingione, and R. Floberghagen GOCE L1b data processing
EGU2009-6763 J. Bouman, S. Rispens, T. Gruber, E. Schrama, P. Visser, C.C. Tscherning, and M. Veicherts Gravity gradient preprocessing at the GOCE HPF
Future Gravity Field Missions
11:00–11:15
EGU2009-8516 F. Flechtner, K.H. Neumayer, B. Doll, J. Munder, Ch. Reigber, and J.C. Raimondo GRAF - A GRACE follow-on mission feasibility study
11:15–11:30
EGU2009-9314 R. Biancale, J.-M. Lemoine, S. Bruinsma, F. Perosanz, and E. D. da Costa GRACE-FO: seeking an optimal mission scenario
11:30–11:45
EGU2009-2184 P. Silvestrin, M. Aguirre, L. Massotti, and S. Cesare Next Generation Gravity Mission: a Step Forward in the Earth’s Gravity Field Determination
11:45–12:00
EGU2009-10285 T. Reubelt, N. Sneeuw, P.N.A.M. Visser, T. van Dam, and M. Losch Future satellite missions for time-variable geopotential recovery - results from the ESA Mass Transport Project