Running a temporary mobile Infrasound Array in Austria: Challenges and Detections
- ZAMG, Geophysics, Wien, Austria (u.mitterbauer@zamg.ac.at)
The mobile Infrasound Array of the Austrian National Data Centerwhich is a part of the Central and Eastern European Infrasound Network (CEEIN) was installed in a location south of Vienna in April 2019. There data will be collected till April 2020 and the analysis will be conducted using dtkGPMCC-Software which is included in the NDC-in-a-Box-Paketand provided by the Comprehensive Treaty Test Ban Organisation (CTBTO). Several challenges occurred due to the power supply with a fuel cell. After constant problems an upgrade was initialized in July 2019. Results of the analysis since beginning of deployment will be shown in the presentation. Detected signals will be compared both with ground truth information and with observations collected by other Infrasound-stations of CEEIN and IMS-station IS26 located in Germany.
How to cite: Mitterbauer, U.: Running a temporary mobile Infrasound Array in Austria: Challenges and Detections, EGU General Assembly 2020, Online, 4–8 May 2020, EGU2020-22078, https://doi.org/10.5194/egusphere-egu2020-22078, 2020.